Think through the extra room first
If you need a study or a child’s room, we discuss light, access and furniture space together. A new partition only works when the rooms on both sides remain usable.
Albahri Innenausbau · Berlin
If your kitchen is already ordered, comparing it with the actual room is particularly useful. For installation in Pankow, we need the design, appliance list and connection photos to identify missing parts or adjustments before the fitting date.

Before work starts
Access, existing materials and rooms you still need to use can change the order of work. Tell us about your property so we can plan around it.
If you need a study or a child’s room, we discuss light, access and furniture space together. A new partition only works when the rooms on both sides remain usable.
For a new kitchen or large cupboards, we compare the design with room measurements and access. Missing parts and connections that are not yet ready should be identified before an installation date is arranged.
Tell us when you still need the kitchen, bedrooms or a workspace. We discuss which tasks belong together and whether a phased approach suits your project.
What your project can include
Use this scope as a starting point. We discuss the work, materials and handovers your property needs, then confirm what belongs in the quote.
Explore kitchen installation across BerlinWalls are not always square and connections are not always where the plan expects them. We compare the kitchen plan, room dimensions and existing connection positions.
Even joints, aligned fronts and carefully fitted fillers give a kitchen its overall appearance. Suitable wall fixings and the manufacturer's installation instructions are equally important.
Electrical, gas and water connections are not automatically included in furniture installation. The required specialist work and responsible contractor must be agreed before installation.
Send the kitchen plan, room photographs and details of the manufacturer and delivery scope. Check that all parts will be delivered, old furniture is removed and any specialist connections are prepared.
Kitchen size, cabinet count, worktop material, cut-outs, wall construction and adjustments affect the work involved. Missing parts or unplanned connection work can change the schedule.

See the workmanship
Dark cabinetry, warm timber and an island at the centre. This kitchen shows how materials, storage and precise installation work together.
View the project photographsIt depends on size, equipment, adjustments and a complete delivery. We can agree a reliable sequence only after reviewing the plan and room.
Responsibility is agreed beforehand. Work requiring specific authorisation may only be carried out by appropriately qualified and authorised specialist contractors.
Yes. Both are part of Pankow. Please provide the full project address so we can discuss access, deliveries and the work you need.
No. Photos, approximate dimensions and a description of what you want to change are enough for an initial conversation. Accurate measurements and technical details are needed before a reliable installation plan can be agreed.