Start with your priorities
Are you replacing a kitchen, renewing finishes or changing several rooms? A list ordered by importance helps define the scope and identify preparation that belongs together.
Albahri Innenausbau · Berlin
If you replace the kitchen in Reinickendorf while retaining other finishes, new cabinets need to suit the existing room. We compare the design, walls and floor heights, discussing adjustments and specialist connections before agreeing the installation scope.

Before work starts
Access, existing materials and rooms you still need to use can change the order of work. Tell us about your property so we can plan around it.
Are you replacing a kitchen, renewing finishes or changing several rooms? A list ordered by importance helps define the scope and identify preparation that belongs together.
Handling routes and working space differ between houses, apartments and business units. Tell us which areas are empty and which you still need to use.
New furniture, doors and flooring need to suit walls, openings and heights. Measurements and adjustments are discussed at the actual property before ordering or installation.
What your project can include
Use this scope as a starting point. We discuss the work, materials and handovers your property needs, then confirm what belongs in the quote.
Explore kitchen installation across BerlinWalls are not always square and connections are not always where the plan expects them. We compare the kitchen plan, room dimensions and existing connection positions.
Even joints, aligned fronts and carefully fitted fillers give a kitchen its overall appearance. Suitable wall fixings and the manufacturer's installation instructions are equally important.
Electrical, gas and water connections are not automatically included in furniture installation. The required specialist work and responsible contractor must be agreed before installation.
Send the kitchen plan, room photographs and details of the manufacturer and delivery scope. Check that all parts will be delivered, old furniture is removed and any specialist connections are prepared.
Kitchen size, cabinet count, worktop material, cut-outs, wall construction and adjustments affect the work involved. Missing parts or unplanned connection work can change the schedule.

See the workmanship
Dark cabinetry, warm timber and an island at the centre. This kitchen shows how materials, storage and precise installation work together.
View the project photographsIt depends on size, equipment, adjustments and a complete delivery. We can agree a reliable sequence only after reviewing the plan and room.
Responsibility is agreed beforehand. Work requiring specific authorisation may only be carried out by appropriately qualified and authorised specialist contractors.
Yes. Explain your priorities and mention later plans too. This helps account for transitions and shared preparation without automatically assuming a full renovation.
Yes. You can enquire about a project there as in other Reinickendorf neighbourhoods. We need the address, photos and a description of the proposed work to discuss it further.