The route to your apartment matters
Is your apartment in a rear building or on an upper floor? Photos of the entrance, passageway and staircase help us plan material sizes, handling and protection of shared areas from the start.
Albahri Innenausbau · Berlin
For kitchen delivery to a front or rear building, the handling route can affect the installation. Send the kitchen design and access measurements so long worktops, cabinets and prepared connection points can be considered together beforehand.

Before work starts
Access, existing materials and rooms you still need to use can change the order of work. Tell us about your property so we can plan around it.
Is your apartment in a rear building or on an upper floor? Photos of the entrance, passageway and staircase help us plan material sizes, handling and protection of shared areas from the start.
A different layout does not have to mean replacing everything. Identify doors, floors and fitted items you want to keep so connections and the sequence of work can be planned around them.
If your business can only close for a limited period, tell us your intended delivery and fit-out dates. We assess possible phases against the actual space and the specialist work involved.
What your project can include
Use this scope as a starting point. We discuss the work, materials and handovers your property needs, then confirm what belongs in the quote.
Explore kitchen installation across BerlinWalls are not always square and connections are not always where the plan expects them. We compare the kitchen plan, room dimensions and existing connection positions.
Even joints, aligned fronts and carefully fitted fillers give a kitchen its overall appearance. Suitable wall fixings and the manufacturer's installation instructions are equally important.
Electrical, gas and water connections are not automatically included in furniture installation. The required specialist work and responsible contractor must be agreed before installation.
Send the kitchen plan, room photographs and details of the manufacturer and delivery scope. Check that all parts will be delivered, old furniture is removed and any specialist connections are prepared.
Kitchen size, cabinet count, worktop material, cut-outs, wall construction and adjustments affect the work involved. Missing parts or unplanned connection work can change the schedule.

See the workmanship
Dark cabinetry, warm timber and an island at the centre. This kitchen shows how materials, storage and precise installation work together.
View the project photographsIt depends on size, equipment, adjustments and a complete delivery. We can agree a reliable sequence only after reviewing the plan and room.
Responsibility is agreed beforehand. Work requiring specific authorisation may only be carried out by appropriately qualified and authorised specialist contractors.
Yes, you can enquire about projects in all six Mitte neighbourhoods. Send the address and a brief description so we can discuss the scope and what is possible at your property.
Show the whole room, the areas you want to change and the access route. For installation work, connection positions, wall surfaces and any existing plans are also useful.