A new office partition in Tempelhof-Schöneberg changes circulation and future furniture placement. We discuss doors, planned wall loads and technical preparation before closing the wall, agreeing and recording the requirements for the particular system.
Let’s check the details that could hold up your renovation
Access, existing materials and rooms you still need to use can change the order of work. Tell us about your property so we can plan around it.
01
Mention fixed dates at the first discussion
A kitchen delivery, move or intended business opening affects other tasks. We discuss these dates alongside preparation and outstanding dependencies rather than bringing them together just before installation.
02
Discuss boundaries between work and daily use
If an office, shop or living area needs to remain in use, tell us the relevant hours and access requirements. We assess whether separation or phased work makes sense for your space.
03
Discuss handovers between tasks beforehand
New partitions, flooring and furnishings often depend on technical preparation. We identify what needs to be ready before installation and which tasks require coordination with separate specialist companies.
Framework, boards, insulation and connections form a system. The choice depends on room height, use and the agreed acoustic and, where relevant, fire requirements.
Identify loads early
Wall cabinets, heavy shelving and sanitary fittings need suitable fixings and possibly reinforcement. These loads must be known before the wall is closed.
Match the preparation to the wall finish
Not every joint finish suits every coating. Raking light, smooth paint finishes and special wall coverings should be discussed early so the preparation suits the intended result.
What to send us
The floor plan, desired wall positions, door openings and planned loads form the basis. Technical requirements are agreed specifically; general acoustic or fire protection promises do not replace system design.
What affects the quote
Wall height, construction, insulation, openings, access and the desired finish affect the quotation. Simple square-metre comparisons often overlook these differences.
See the workmanship
Take a closer look at a related project
Salon fit-out with illuminated mirrors
From an open construction space to a furnished salon. Illuminated mirrors, clear workstations and light surfaces give the room its structure.
The partitions described here are non-load-bearing. Existing structural elements must not be altered without appropriate assessment.
Can doors be installed in a drywall partition?
Yes, if the framework and opening are designed for the intended door system. Door weight and frame type belong in the planning.
Can I enquire about an office or shop renovation?
Yes. Explain the intended use, areas involved and whether the business can pause. Fittings, material deliveries and specialist work are discussed separately within the scope.
What if I already have a confirmed delivery date?
Share it early and send the delivery details. Prepared areas, complete components and required connections need to align with the planned installation; we discuss outstanding dependencies beforehand.
Your next step
Tell us what you want to change in Tempelhof-Schöneberg
A few photographs, the property address and a short description are enough to start the conversation. Let us know about your preferred dates and whether the space will remain in use.