Discuss furnishings and wall loads together
Shelving, wall cupboards and workstation equipment need suitable fixings. Show us what will be wall-mounted so the substrate and any necessary reinforcement can be considered early.
Albahri Innenausbau · Berlin
For a new drywall partition in Lichtenberg, heavy shelving should be discussed before boarding. We identify planned loads, door weights and connection details early so the framing and any reinforcement suit the agreed system and intended use.

Before work starts
Access, existing materials and rooms you still need to use can change the order of work. Tell us about your property so we can plan around it.
Shelving, wall cupboards and workstation equipment need suitable fixings. Show us what will be wall-mounted so the substrate and any necessary reinforcement can be considered early.
Doors, furniture and movement need to work together in a home or business. A plan showing equipment and furniture helps coordinate new partitions and usable floor space with the way the room will be used.
Plans and records of earlier alterations help explain existing construction. Missing information is identified as an open question, rather than replaced with assumptions about a neighbourhood.
What your project can include
Use this scope as a starting point. We discuss the work, materials and handovers your property needs, then confirm what belongs in the quote.
Explore drywall across BerlinFramework, boards, insulation and connections form a system. The choice depends on room height, use and the agreed acoustic and, where relevant, fire requirements.
Wall cabinets, heavy shelving and sanitary fittings need suitable fixings and possibly reinforcement. These loads must be known before the wall is closed.
Not every joint finish suits every coating. Raking light, smooth paint finishes and special wall coverings should be discussed early so the preparation suits the intended result.
The floor plan, desired wall positions, door openings and planned loads form the basis. Technical requirements are agreed specifically; general acoustic or fire protection promises do not replace system design.
Wall height, construction, insulation, openings, access and the desired finish affect the quotation. Simple square-metre comparisons often overlook these differences.

See the workmanship
From an open construction space to a furnished salon. Illuminated mirrors, clear workstations and light surfaces give the room its structure.
View the project photographsThe partitions described here are non-load-bearing. Existing structural elements must not be altered without appropriate assessment.
Yes, if the framework and opening are designed for the intended door system. Door weight and frame type belong in the planning.
Yes. Planned loads should be discussed before the wall is closed. Send dimensions, weight and proposed positions where that information is available.
Yes. Neu-Hohenschönhausen is part of Lichtenberg. We consider the project against its address and actual condition rather than the neighbourhood name alone.