Do not judge a wall by its appearance alone
New fixings or alterations require information about the existing construction. A photograph cannot establish whether a wall is load-bearing, removable or suitable for heavy items.
Albahri Innenausbau · Berlin
For a new commercial layout in Marzahn-Hellersdorf, equipment and available heights help define the options. We discuss door routes, fixing loads and technical interfaces before agreeing the construction and sequence of work for your project.

Before work starts
Access, existing materials and rooms you still need to use can change the order of work. Tell us about your property so we can plan around it.
New fixings or alterations require information about the existing construction. A photograph cannot establish whether a wall is load-bearing, removable or suitable for heavy items.
Floor build-up, suspended ceilings and door connections affect usable height. These measurements are considered together before selecting new systems so the proposed solution actually fits.
You may need better separation, storage or a new floor rather than a full renovation. Describe the problem and the areas you want to keep so the required scope can be defined.
What your project can include
Use this scope as a starting point. We discuss the work, materials and handovers your property needs, then confirm what belongs in the quote.
Explore commercial fit-out across BerlinWhere do people work, where do customers arrive and where is material moved? These questions shape a practical layout. Furnishings and service connections are considered together.
An office has different requirements from a salon or workshop. Changes of use, fire safety, accessibility and services may need review by specialist planners and the relevant authorities.
If a business remains open, protective measures, access and construction stages need particularly careful coordination. Not every project can be carried out without restrictions.
Tell us the intended use, area, available plans and desired opening date. Landlord approvals and any necessary specialist planning should be clarified early.
Use, fit-out level, technical requirements and phased construction determine the work. Access, deliveries and permitted working hours also affect planning.

See the workmanship
Generous work areas, light surfaces and a clear layout. The photographs show different parts of a commercial workshop.
View the project photographsYour questions
Anything else on your mind?
Write to us.
This depends on the type and extent of the work. Dust, noise, safety requirements and necessary access determine whether phased construction is possible.
This cannot be determined from the fit-out wish alone. Existing and intended uses must be checked, with specialist planners and building control involved where necessary.
Yes. Send a plan, the intended position and details of doors and items to be mounted. Existing construction and any required permissions are clarified before work.
New finishes and preparation can alter the height. That affects doors, adjoining rooms and fixed furniture, so these transitions belong in the initial assessment.